The PID temperature controller operating instructions recommend a 45 minute warmup period prior to pulling the first coffee shot. This allows the temperature of the group head below the boiler to stabilize, which reduces water heating during the shot, and allows for quicker intervals between shots for the water temperature to restabalize.
I run an Insteon based home automation network, so I decided to install an Insteon plug in on/off module that I had available.
|
Insteon On/Off Module |
|
The completed installation |
|
These timer modules look quite contemporary |
You could also install a mechanical or standalone digital timer. In my case, I wrote a very simple program in my Universal Devices ISY-994i home automation controller to switch on the pre-heat function at 5am, and shut it off at 9am. This will also help prevent the machine from being left on all day, and potentially triggering the 165C overheat trip sensor.
In use - works great - I make sure the machine is filled with water and the front panel power switch left in the on position at night, with a couple of coffee cups left on the warming tray. In the morning, I come downstairs, and the boiler temperature has stabalized and the group head is hot and ready for making coffee.